Final Steps Before Production
As part of the final steps before production begins a received a Bill of Materials or BOM from the manufacturing company Herotime. The BOM has specific information on every item in the game. It show the art, dimensions, and the materials for each part from the box to the cards to the rulebook. This is the final check that everything is correct and ready to go. The BOM also shows how the game will be assembled in the box. It also shows how the games will be packed into the shipping cartons. The image below shows both of those aspects of the assembly process.
Productions should begin any day now with a scheduled completion date of December 8. The arrangements for shipping have been completed and the shipper is ready to pickup once the assembly process is completed.
Hopefully the next update will have some images from production!